Harvard Ave Maintenance Facility

Harvard Ave Maintenance Facility

The Harvard Ave Maintenance Facility was a very large 190,000 sq ft roof replacement. The system consisted of a total of 4.4" of insulation and a mechanically fastened 60 mil reinforced EPDM roof with enhanced flashings and seams. The roof replacement project consisted of many skylight and old curb removal, as well as plans for a future solar array. This roof came with a 20-year roof warranty and was completed in November 2021.

 

 

Date

05 April 2019

Tags

Commercial